
Home |
Daily Progress Photos | The Phases of Construction | The Timeline
Previous | August 9th, 2006 | Next
Foundation work- Click on a picture for a larger image
This existing footing caused some complication. It needed to be removed on the one side. faxes went back and forth with the engineer about how to properly achieve this, and by the time Zac came back to the site with the solution, the whole thing had fallen into the hole. Problem solved. New footings all around!
This under floor hole grew to a 15 foot long footing and an 11 foot lon, 4 foot high wall. WOW!