Previous | August 17th, 2006 | Next

Foundation - Click on a picture for a larger image


planter boxes take shape

The level of the garage is lowered further to make the foundation deeper

layers of sand and visqueen are added to the garage slab, to keep the plants out.

Flashing on the side of the house where the footing will come up to replace the cut slab.


Rebar in the Fireplace


The fireplace footing was dug deeper by the end of the day.

Holes cut in the rim joist to accommodate the drilling of the hold-down bolt holes.

Other areas had to be cut out to accommodate the HUGE drill bit.

And windows had to be removed.

Rebar is added to the garage slab.

 