Home | Daily Progress Photos | The Phases of Construction | The Timeline

Previous | August 23rd, 2006 | Next

The Foundation is poured - Click on a picture for a larger image


Installation of the "Ufer Ground"

Ground wire

Electrical sweeps


Wire tying the ground

Beginning to pour

Truck #1 of 6

Rebar dowels put into existing footing on both sides of the fireplace

Form are already getting removed.

The "Big Wall"

Steel templates with buried bolts

Window footing

The finisher with his slab

Only the garage slab left to go. One more truck.

Planters

Removing forms

The final bit of concrete

Fireplace slab


Fireplace and side yard slabs