Installation of the "Ufer Ground"
|

Ground wire
|

Electrical sweeps
|

Wire tying the ground
|

Beginning to pour
|

Truck #1 of 6
|
|
|

Rebar dowels put into existing footing on both sides of the fireplace |
|
|

Form are already getting removed.
|

The "Big Wall"
|

Steel templates with buried bolts |

Window footing |

The finisher with his slab |

Only the garage slab left to go. One more truck. |

Planters |

Removing forms |

The final bit of concrete
|

Fireplace slab
|

Fireplace and side yard slabs
|
| Previous | August 23rd, 2006 | Next |
|