Previous | September 11th, 2006 | Next

Framing. More demo and some floor joist work in the garage and Family room - Click on a picture for a larger image


The hole in the living room is enlarged to enable patching .

Hallway too!

Sean added a little extra space for the crawl space access.

2x12 Ceiling joists are finished in the garage. The 3/4s of a floor above the garage will be a storage area.