And so the entire wall that included the front door is removed. The slab underneath is sub-par and will be replace by a stemwall and wood framing - From outside |

From the inside. |

Rebar and greybeam ready for a concrete truck.
Richard met with the inspector and convinced him to sign the card even though we would have to make a change to the front entryway and include it in the pour.
|

At the "Nose" of the front porch slab some rebar should keep it whole.
|

Drypack at the bottom of the steel columns |

Subfloor in the family room
|

Framing continues upwards in the garage
|

Garage subfloor is finished |