Framing - Click on a picture for a larger image


And so the entire wall that included the front door is removed. The slab underneath is sub-par and will be replace by a stemwall and wood framing - From outside

From the inside.


Rebar and greybeam ready for a concrete truck.
Richard met with the inspector and convinced him to sign the card even though we would have to make a change to the front entryway and include it in the pour.


At the "Nose" of the front porch slab some rebar should keep it whole.

Drypack at the bottom of the steel columns

Subfloor in the family room

Framing continues upwards in the garage

Garage subfloor is finished