Previous | September 20th, 2006 | Next

Framing - Click on a picture for a larger image

Ceiling joists in the living room


The Garage continues upwards

Concrete crew forms up the new footing & Stemwall at the front entrance

The final piece of sideyard concrete. A steel frame had been made earlier but we had them epoxy rebar into the existing slab.

The 2nd floor planter drain was connected to the existing gutter drain after some major archeology and disconnection of surrounding sprinkler lines.
 