Ceiling joists in the living room
|

The Garage continues upwards
|

Concrete crew forms up the new footing & Stemwall at the front entrance
|

The final piece of sideyard concrete. A steel frame had been made earlier but we had them epoxy rebar into the existing slab. |

The 2nd floor planter drain was connected to the existing gutter drain after some major archeology and disconnection of surrounding sprinkler lines. |
|