Team Concrete returns
|
|

Pouring into a wheelbarrow for the small slab
in the sideyard
|

Pouring the front porch slab. A critical adjustment to a form height was made seconds after this picture was taken (disaster averted!). |

There it is. Finished. What will happen when the wooden form at the front is removed later??? |

Bolts pointing up for framing and stab bolts for attaching a header for framing and subfloor.
|

Sub-subfloor above the kitchen and living rooms
|

1/2 inch plywood evens out the height of the 12inch beams and the 11 1/2 inch joists. When the 3/4 inch subfloor is placed above this we should have a solid, quiet 2nd floor.
|

This time most of Matias came through the ceiling. It's a good thing we decided to remove and replace this ceiling just the day before. |

Sean spent most of the day pre-cutting the roof rafters for the garage. Ready for when the huge ridge beam comes in on Tuesday. |
| Previous | September 22nd, 2006 | Next |
|