Previous | September 26th, 2006 | Next

Framing & demo - Click on a picture for a larger image


The garage ridge beam arrived and was heaved up to the 2nd floor

Pre-cut rafters went up quickly

The family room was framed out a little more

and a little more subfloor was put down

Jason and Zac did some major demolition, removing the electrical, plaster, plumbing and ceiling joists over the playroom and bathroom