This seemed like a big day. Framing, Cleanup and MORE DEMO - Click on a picture for a larger image

The Cleanup crew came and removed the HUGE trash piles that were taking over the property
|

See, we have a driveway again |

In the morning a huge load of Marvin Windows showed up. |

Unloading Windows
|
|
|

By 9:00am the framers got all of the North side rafters in place |
|

After more demo a new wall was suggested in the bathroom |

Some of the top layer of plywood was placed on the 2nd floor
|

Zac and Jason Did some more major demo of ceilings. |

The house now has no original ceiling except in a closet where the cedar lined walls still match a cedar ceiling. |

Demo of the kitchen required some very careful cabinet protection and a lot of elbow grease. |

After removing the maple crown molding the plaster was still very hard to remove from above the cabinets. |

Kitchen Skylight!
|
|