Concrete patching, framing, yet more demo and 2ND STORY!- Click on a picture for a larger image

After JR Construction botched the front lip of the front porch step we had them come back to try their hand at a patch job. We'll see if this holds. |

Zac removed the header and some plaster at the entrance to the bathroom from the living room
|

Ceiling joists go up above the dining room |
|
|

In the process we realize a beam needs to be retrofitted just above the door header in the dining room and through to the play room |

Beams going up into the office
|

Beams in the office
|
|
|

The cantilever at the front porch, cut down with a board on the face. |

And. most exciting of all, some 2nd story walls! (master bath wall above the kitchen) |