Previous | October 3rd, 2006 | Next

Concrete patching, framing, yet more demo and 2ND STORY!- Click on a picture for a larger image


After JR Construction botched the front lip of the front porch step we had them come back to try their hand at a patch job. We'll see if this holds.

Zac removed the header and some plaster at the entrance to the bathroom from the living room

Ceiling joists go up above the dining room


In the process we realize a beam needs to be retrofitted just above the door header in the dining room and through to the play room

Beams going up into the office

Beams in the office

The cantilever at the front porch, cut down with a board on the face.

And. most exciting of all, some 2nd story walls! (master bath wall above the kitchen)