Home | Daily Progress Photos | The Phases of Construction | The Timeline

Previous | October 6th, 2006 | Next

Framing - Click on a picture for a larger image


Joists all around


Joists over the bathroom


Joists for the cantilevered
windows in the back



Demery looks over the new joists in the playroom

And looks over the 2nd floor framing in the front

The Architect's assistant checks the master bedroom framing

Some new subfloor


Cantilever over the driveway for the boys' bathroom
Previous | October 6th, 2006 | Next