Framing - Click on a picture for a larger image


Some new framing on the 2nd floor. Master Bed on the left, library in the center, Devin's room on the right.

Master closet on the left and master bath on the right

Devin's room on the left, Library on the right

The small square of boxed-in floor space in the center was unintentionally built and will (fortunately) serve as a necessary HVAC shaft

The floor is finished, but for about 4 square feet!
 