Framing - Click on a picture for a larger image


Starting the process of putting up the roof rafters. On the North side

On the South Side.

Richard was pleased that the two sides were only off by a fraction of an inch. Then we pointed out from below that the block was a little warped. The two sides were dead on!

With the first part of the ridge beam in place.

In go the stairs

These was also some more interior wall framing.

Jim and Demery discuss serious things