Overall. . .
Roof Decking and HVAC today. |

The roof deck is almost all the way on. |

This view of the house from up the street
shows it growing over the neighbor's house |

but from a couple of houses up it does not overpower.
|

Sean works the balance beam installing outlookers. |

Tino and Ramone work on interior pony-walls |

The guys from JRE Heating and Air, Brian & Joey, begin installing the upstairs furnace. Click here for general HAVC details |

By the end of the day there was a furnace and ducts to each upstairs room. This system will provide upstairs, kitchen and family room HVAC and a seperate system will provide the rest of the downstairs.
|

In the master bedroom. |

Looking into the HVAC attic from the master bedroom, the furnace below and ducts above.
|

This duct goes between the boys' loft, will feed air into both lofts and beyond into Devin's room
|

In Dexter's room. The duct comes into the room in the wall and then goes around the corner goes into the loft.
|

Reid's Room
|

Looking from the landing toward the master bed and the soffit over the library |

Looking from the landing toward the master bed and the soffit over the library |

Looking from the landing toward the HVAC closet over the master bath. |

Looking up toward the master bed and the soffit over the library |

The trash pile grows. But. . . a Craiglist ad for free firewood might change that. Watch this space.
|
|
|
| |
|