Framing - Today was a day of major roof framing/decking. The dormers belowwere
"California Framed", meaning they were framed on top of an existing roof deck
instead of integrated with the framing below.


Overall . . .


The gable at the front, Devin's room


The gable at the back, Dexter and Reid's rooms.

Overall the back is looking great.

Craigslist strikes again. Today someone came to pick up wood, someone came to buy the old front door and someone came to pick up some dirt. Yeah!

Rafter notches for the outlookers

Outlookers on the driveway side of the house and a ridge beam for the bathroom pop-out

OOPS. Ages ago when the temporary power pole was placed we thought it wasn't in quite the rght place, but wouldn't be a problem. Today I realized that it was actually in the way of the roofline. After a few frantic calls to the pole company and the City of Glendale a solution was decided on.

The potential for disaster still looms. So, does anyone have a generator we can borrow for a few days? ;-)