Home |
Daily Progress Photos | The Phases of Construction | The Timeline
Previous | November 8th, 2006 | Next
Framing - Today was a day of major roof framing/decking. The dormers belowwere
"California Framed", meaning they were framed on top of an existing roof deck
instead of integrated with the framing below.
OOPS. Ages ago when the temporary power pole was placed we thought it wasn't in quite the rght place, but wouldn't be a problem. Today I realized that it was actually in the way of the roofline. After a few frantic calls to the pole company and the City of Glendale a solution was decided on. The potential for disaster still looms. So, does anyone have a generator we can borrow for a few days? ;-) |
|