Previous | November 9th, 2006 | Next

Framing - Click on a picture for a larger image


Overall. . .



When a series of measurements came up wrong we realized that the box outside Devin's window was too big on both sides to accomodate the roofline.

Fortunately it was designed and engineered with some crazy beams (see the pics from Oct. 4th) so that the roof could do this. The easy solution was to have Sean cut away 2 big boxes and, viola, the roofline worked.

Outlookers over the garage.

Demery meets with the Electrician, Serge.


HVAC ducts carry down the shaft


and into the kitchen.