
Home |
Daily Progress Photos | The Phases of Construction | The Timeline
Previous | November 21st, 2006 | Next
Framing - Sheathing, Chimney, Windows, Tree Trimming, Power Pole Removal
Click on a picture for a larger image
| At the very end of the work day a crew came and trimmed the tree that was overhanging the master bedroom balcony. At the same time Porto Kan came to remove the power pole. Now there is nothing in the way of the roof extensions. | |
| Previous | November 21st, 2006 | Next |